critical-path

critical-path is an Agent behaviour & coding discipline skill for AI agents, published by heyJordanParker in the dotfiles repository on GitHub. Skillspace rates critical-path D (68/100) and it passed the safety scan; the rating is based on static analysis only.

Process for changes with a large blast radius — files with many callers or repo-p95 complexity, and actions that are destructive, hard to reverse, or visible outside the repo. TRIGGER before editing a file whose enrichment context shows callers ≥ 20 or complexity at the repo p95, and before any delete, force-push, schema drop, process kill, push, pull-request operation, shared-infrastructure change, or third-party upload.

Grade
D
Quality
68 / 100
Safety
Passed
GitHub stars
20

Unproven: rated by static analysis only, not yet compared head-to-head.

Our two independent classifiers differ on this skill's category, so treat the placement as provisional.

This rating describes the version of the repository we crawled; it may have changed since, so go by its current files.

Our review

Architecture
100 / 100
Maturity
Basic: a single SKILL.md
Security scan
No issues found
License
Not declared. Check the repository before reusing it.
Adoption
Adopted by 0 other repositories, in 0 collections

Not checked yet

  • Not judged on the rubric yet (not a contender in its category)
  • No blind task eval yet
  • Scope (portable / vendor / repo-internal) not assessed; only the top of each category is read for scope
  • Sibling files (scripts, references) not fetched; security scan covers SKILL.md only

Skillspace indexes and rates this skill; it does not host or endorse it. Run third-party skills at your own risk.