neqsim-equipment-cost-estimation

neqsim-equipment-cost-estimation is a Physics, mathematics & simulation skill for AI agents, published by equinor in the neqsim repository on GitHub. Skillspace rates neqsim-equipment-cost-estimation D (69/100) and it passed the safety scan; the rating is based on static analysis only.

Equipment and process CAPEX estimation — Turton/Peters/Ulrich/Seider correlations, CEPCI escalation, material/pressure factors, bare-module to grass-roots, AACE class 1-5, location factors, currency conversion, CostEstimateResult reconciliation, and mechanical-design-driven topsides/SURF/well rollups. USE WHEN: a task requires a +30%/-30% Class-3/4 estimate for equipment, a process flowsheet, topsides, SURF, wells, or reservoir-to-market CAPEX. Anchors on CostEstimationCalculator and ProcessCostEstimate.

Grade
D
Quality
69 / 100
Safety
Passed
GitHub stars
132

Unproven: rated by static analysis only, not yet compared head-to-head.

This rating describes the version of the repository we crawled; it may have changed since, so go by its current files.

Our review

Architecture
91 / 100
Maturity
Basic: a single SKILL.md
Security scan
No issues found
License
Apache-2.0
Adoption
Adopted by 0 other repositories, in 0 collections

Not checked yet

  • Not judged on the rubric yet (not a contender in its category)
  • No blind task eval yet
  • Scope (portable / vendor / repo-internal) not assessed; only the top of each category is read for scope
  • Sibling files (scripts, references) not fetched; security scan covers SKILL.md only

Skillspace indexes and rates this skill; it does not host or endorse it. Run third-party skills at your own risk.