production-scheduling
production-scheduling is a Logistics & supply chain skill for AI agents, published by aaione in the everything-claude-code-zh repository on GitHub. Skillspace rates production-scheduling C (72/100) and it passed the safety scan; the rating is based on static analysis only.
生产调度、作业排序、线平衡、换型优化和瓶颈解决的规范化专业知识。 基于 15 年以上经验的生产调度专家。包括 TOC/鼓-缓冲-绳、SMED、OEE 分析、 中断响应框架和 ERP/MES 交互模式。调度生产、解决瓶颈、优化换型、 响应中断或平衡制造线时使用。
- Grade
- C
- Quality
- 72 / 100
- Safety
- Passed
- GitHub stars
- 23
Unproven: rated by static analysis only, not yet compared head-to-head.
Not launch-quality. It is graded C with a clean safety verdict, but our quality filters exclude it: it is a near-duplicate variant of another skill. So it is not in our launch-quality set, the skills our MCP server searches and recommends. How launch-quality is decided
This rating describes the version of the repository we crawled; it may have changed since, so go by its current files.
Our review
- Architecture
- 84 / 100
- Maturity
- Packaged: licensed, with a version or references
- Security scan
- No issues found
- License
- MIT
- Adoption
- Adopted by 0 other repositories, in 0 collections
Not checked yet
- Category is a classifier prediction; no model has read this skill yet
- Not judged on the rubric yet (not a contender in its category)
- No blind task eval yet
- Scope (portable / vendor / repo-internal) not assessed; only the top of each category is read for scope
- Sibling files (scripts, references) not fetched; security scan covers SKILL.md only
Skillspace indexes and rates this skill; it does not host or endorse it. Run third-party skills at your own risk.